Nuances of designing a business center
The business center today is becoming not only a place for meetings and negotiations. This facility with complex engineering equipment should fit harmoniously into the city, so great importance is paid to the choice of a construction site. Full-fledged conditions for work and rest are created here.
The shopping center has restaurants and cafes, ATMs and terminals, there are play areas for kids and Parking. At the same time, the staff of the shopping center pays attention to security. In essence, the center becomes an independent island, where comfortable conditions for doing business are created. Therefore, the cost of construction pays off in a short time.
Before proceeding with the construction of an office building, it is worth developing a concept that meets sanitary requirements and regulations. Without taking into account the specifics and prospects of development, it will be difficult to create normal operating conditions.
The main responsibility falls on the general designer. The designer summarizes and analyzes information that relates to the results of engineering and geodetic studies. The opinion of economists, real estate analysts and the management company is taken into account.
Urban planning justification and a package of pre-project documents passes through the authorities to obtain the necessary permits. The layout of the territory is necessary to determine the boundaries of the allocated area and surveying, if necessary.
Before proceeding to the development of sketches, it is necessary to make an architectural decision, choose a design idea for finishing facades and interiors of premises. The number of customers and payback largely depends on visual perception. At the same time, you need to create a unique style.
The preliminary design will have to be agreed. Today, 3D visualization is being done, since such an approach allows you to make a full tour of the site and premises. It becomes easier to make adjustments, it is possible to attract investors faster.
When developing the master plan and layout, a landscape design project is created. The surrounding area should be landscaped, infrastructure facilities, parking and recreation areas are located correctly.
Special attention is paid to the facade part. For a large high-rise building, it is necessary to apply energy-saving technologies to reduce operating costs. The facade can be double, mounted ventilated systems are used. They always attract attention, help reduce noise and heat losses by up to 50 percent.
Projects, drawings, schemes affect every element: load-bearing structures and partitions, the location of doors and windows, communication networks and fire safety.
The security and fire alarm system project includes a full range of fire protection, which includes the following sections:
The design bureau is ready to create a business center project, coordinate the documents and immediately receive a positive expert opinion. In addition to the preparation of documentation, the best architectural and design solutions will be found, detailed recommendations will be given, estimates will be made.
A competent architectural design of the building is the key to trouble-free construction and operation of the business center.
Feature of the concept
Before proceeding with the construction of an office building, it is worth developing a concept that meets sanitary requirements and regulations. Without taking into account the specifics and prospects of development, it will be difficult to create normal operating conditions.
The main responsibility falls on the general designer. The designer summarizes and analyzes information that relates to the results of engineering and geodetic studies. The opinion of economists, real estate analysts and the management company is taken into account.
Urban planning justification and a package of pre-project documents passes through the authorities to obtain the necessary permits. The layout of the territory is necessary to determine the boundaries of the allocated area and surveying, if necessary.
Before proceeding to the development of sketches, it is necessary to make an architectural decision, choose a design idea for finishing facades and interiors of premises. The number of customers and payback largely depends on visual perception. At the same time, you need to create a unique style.
The preliminary design will have to be agreed. Today, 3D visualization is being done, since such an approach allows you to make a full tour of the site and premises. It becomes easier to make adjustments, it is possible to attract investors faster.
When developing the master plan and layout, a landscape design project is created. The surrounding area should be landscaped, infrastructure facilities, parking and recreation areas are located correctly.
Special attention is paid to the facade part. For a large high-rise building, it is necessary to apply energy-saving technologies to reduce operating costs. The facade can be double, mounted ventilated systems are used. They always attract attention, help reduce noise and heat losses by up to 50 percent.
Documentation development
It is impossible to build a business center without developing all the working documentation. It will become a detailed instruction for builders, will help to carry out construction using the selected technologies in a certain time.Projects, drawings, schemes affect every element: load-bearing structures and partitions, the location of doors and windows, communication networks and fire safety.
The security and fire alarm system project includes a full range of fire protection, which includes the following sections:
- fire escape routes and signs for visitors;
- ventilation and smoke removal system;
- fire protection system and remote control;
- fire and smoke detectors;
- irrigation system or other type of fire extinguishing;
- notification methods;
- stationary fire barriers (partitions made of glass, concrete, silicate gas);
- automatic fire barriers (automatic gate and curtain devices).
The design bureau is ready to create a business center project, coordinate the documents and immediately receive a positive expert opinion. In addition to the preparation of documentation, the best architectural and design solutions will be found, detailed recommendations will be given, estimates will be made.
A competent architectural design of the building is the key to trouble-free construction and operation of the business center.