• For dealers
  • Presentation
  • Our production
  • Catalog
  • BIM
  • ...
    English Русский
    Callback
    en
    Expert in the production of industrial gates and fire barriers
    +7 495 980-80-33
    info@mva-rolltor.ru
    COMPLETED WORKS
    • Roll-up gates and fire-resistant barriers for shopping and business centers
    • Fire barriers and gates for administrative buildings
    • Fire-resistant barriers and gates for the warehouse
    • Gates and curtains for parking lots and garages
    • Gates and curtains for production and industrial premises
    • Industrial gates for industrial and aviation hangars
    COMPANY
    • News
    • Our production
    • Certificates
    • Guarantee
    • Architects (BIM, DWG)
    • About the MBA brand
    • Contacts
    • Our catalog (pdf)
    INSTALLATION AND SERVICE
    • Free project
    • Maintenance of gates and curtains
    • Repair and replacement of fire curtains and gates
    • Free measurement
    • Installation supervision
    • Installation of fire-fighting and industrial gates and curtains
    • AUTOMATION AND DRIVES
    FIRE CURTAINS
    • Fire curtains EI 30, EI 60, EI 90, EI120 (without irrigation)
      Fire curtains EI 30, EI 60, EI 90, EI120 (without irrigation)
    • Smoke curtains rolled E60 (without irrigation)
      Smoke curtains rolled E60 (without irrigation)
    • Fire curtains EI60, EI120, EI180 (for irrigation)
      Fire curtains EI60, EI120, EI180 (for irrigation)
    • Fire curtains for windows
      Fire curtains for windows
    • Fire and smoke protection curtains "Accordion" EI 60, EI 180, Е60
      Fire and smoke protection curtains "Accordion" EI 60, EI 180, Е60
    • Fire-resistant barriers of conveyor openings
      Fire-resistant barriers of conveyor openings
    • Rolled smoke- and gas-proof curtains (gates) EIS 60
      Rolled smoke- and gas-proof curtains (gates) EIS 60
    FIRE GATES
    • Sliding fire gates EI 60, EI 90
      Sliding fire gates EI 60, EI 90
    • Sectional fire gates EI 60
      Sectional fire gates EI 60
    • Roll-up fire gates EI-60 Firerollgate
      Roll-up fire gates EI-60 Firerollgate
    • Swing fire gates EI 60
      Swing fire gates EI 60
    INDUSTRIAL GATES
    • Rolled industrial gates AL-120 insulated
      Rolled industrial gates AL-120 insulated
    • Automatic roll gates made of steel profile M-80
      Automatic roll gates made of steel profile M-80
    • PVC high-speed gates
      PVC high-speed gates
    • Rolled perforated gates (roller shutters) M-80P
      Rolled perforated gates (roller shutters) M-80P
    Ещё
      en
      FIRE CURTAINS
      FIRE GATES
      INDUSTRIAL GATES
      Ещё
        +7 495 980-80-33
        info@mva-rolltor.ru
        en
        Телефоны
        +7 495 980-80-33
        Заказать звонок
        ENG РУС
        • Fire curtains
        • Fire gates
        • Industrial Roll Gates
        • Completed works
        • Services
        • Company
          • Back
          • Company
          • News
          • Our production
          • Certificates
          • Guarantee
            • Back
            • Guarantee
            • Guarantee for gates and curtains
          • Architects (BIM, DWG)
            • Back
            • Architects (BIM, DWG)
            • Architects and designers
          • About the MBA brand
          • Contacts
          • Our catalog (pdf)
        • BIM
        • Automation and accessories
        • +7 495 980-80-33
        Contacts
        Moscow, Dorozhnaya str., 60, building 4, office 118
        info@mva-rolltor.ru
        • Вконтакте
        • Telegram
        • YouTube
        Главная
        -
        Услуги
        -Installation of fire-fighting and industrial gates and curtains

        Installation of fire-fighting and industrial gates and curtains

        Share

        услуга по монтажу рулонных ворот и противопожарных преград

        The MBA company offers you professional installation of gates with the provision of quality assurance. The installation is carried out by qualified and experienced employees. There is a license of the Ministry of Emergency Situations for the installation and maintenance of fire protection systems.

        05.08.2019

        Installation of automatic fire doors

        Installation of automatic gates is a rather difficult job that requires special knowledge, experience and skills from those performing it. All stages of installation must take place in strict sequence, in compliance with the norms and rules of such work. Otherwise, the finished structure will not be able to boast of the duration of operation, and the cost of its speedy repair will significantly exceed the cost of professional installation services.

        • One of the most frequent orders is the installation of automatic sliding gates that move along the wall and do not take up much free space.
        • The installation of swing gates is also popular, attracting users with its own mechanical stability and reliability of the opening mechanism.
        • Among the owners of business facilities, the installation of roll gates is particularly in demand, which, when opened, compactly rise to the top of the opening and roll up into a roll located in a box.
        • The simplest version of the design can be called a lifting gate. In spacious rooms and in limited areas, when opened, they rise to the ceiling, therefore they are extremely in demand as industrial gates.

        Stages of gate installation

        1. The process of installing gate structures varies somewhat, depending on their features. In general, it includes three stages:First, the opening is measured, the size of the gate structure depends on its dimensions, as well as its mechanism, due to which they will open and close.
        2. At the initial stage of installation, the company's masters are engaged in preparing the opening for the installation of the gate. Sometimes, for hanging a gate, an opening reinforcement with a welded structure is required. Next, specialists mount the guides required for the installation of sliding, roll-up or lifting gates. This job requires maximum care. After all, even a millimeter deviation in the future can provoke rapid wear of the lifting mechanism and other breakdowns.
        3. The fastening of the gate leaf is sometimes preceded by hanging sections together, based on the features of the chosen design.
        Of course, gates of one type or another will be mounted with their own nuances.

        The cost of installation of fire and industrial gates

        The cost of installing fire barriers and gates is calculated individually and depends on many factors. Much depends on the correctness of the measurement (the measuring sheet is being prepared) and the preparation of the opening, all requirements are pre-specified in the TOR for the preparation of the opening.

        Even more, the installation price depends on the size of the gate, because the delivery and installation of large gates will require the use of special equipment. MVA industrial gates have a lot of weight and require special skills to install such products.

        Why should the installation of gates be trusted by the specialists of the MBA company?

        • We carry out installation not only with strict observance of norms and rules, but also following the needs of customers.
        • We save time and money of customers, because the presence of average prices in the region and several teams of craftsmen allows you to install the gates at any time convenient for them, without weekends and holidays.
        • We instruct users free of charge on further maintenance and operation of the gate.
        • We conclude a contract and provide a long-term quality guarantee for installation work, as well as for gates, if they were purchased in our company.

        Remember, the uninterrupted operation of the gates and the absence of problems during their long-term operation directly depends on the quality of the installation work carried out. Therefore, do not take risks, contact the professionals of the MBA production company!

        Installation of fire curtains MBA

        Installation and adjustment of fire curtains should be carried out by specialists of the manufacturer, self-installation without a license of the Ministry of Emergency Situations threatens that damage to the canvas or the structure of the fire-resistant curtain is possible, as well as the fact that the inspecting fire inspection will not accept this design without the appropriate documents.

        Installers of our company, in addition to the direct installation of a fire curtain, connect the curtain control unit to the fire safety system and check the lowering of the barrier when a fire alarm is triggered. The fire-resistant barrier control unit has corresponding outputs - "normally closed dry contact".

        блок управления противопожарной и дымозащитной шторы

        Stages of installation of a fire curtain

        1. Preparatory work and marking.
        2. Installation of the box.
        3. Installation of side rails.
        4. Mounting of the shaft with the web assembly.
        5. Installation of the web guide.
        6. Fixing of side covers of vertical guides.
        7. Installation of the control unit and adjustment of the end caps.
        8. Checking the operation of the fire curtain from the fire contact.

        Preparation of openings for installation

        As practice shows, many customers and construction contractors do not represent the process of installing fire-fighting structures and the weight of the canvas. Large-width multilayer curtains have a fairly decent weight due to the thick non-combustible fabric reinforced with metal thread. To install such fire barriers, a solid concrete or metal base is required. It is impossible to mount on GCL, silicate gas and other materials with insufficient strength.
        To prevent problems with installation, our specialists prepare a technical specification for an object under construction, according to which preliminary preparation of the opening for installation is carried out, for example, the opening is reinforced with a construction of a metal square pipe. For the installation of fire curtains EI 60 at high altitude, lifting equipment and the presence of scaffolding-tour may be required. The need for such equipment and equipment is discussed with each customer individually.

        монтаж противопожарных штор

        Features of installation of smoke-proof and fire-fighting curtains of the "Accordion" type

        The complex design of fire and smoke protection curtains "Accordion" requires high qualification and proper design of the structure before installation. The complex shape and large size of the curtains require the installation of several motors that lift each section. The synchronization of the motors lowering and lifting the box of the entire structure should be with minimal deviations, since there is a risk of distortion and jamming of the obstacle during movement. Due to the lack of guides, a special mechanism is provided that closes the edges of the accordion curtain with a metal box. The whole structure is lowered first, then the mechanism for closing the side rails is triggered, if such are provided for by the project.

        IMG_0254.jpg


        Фотогалерея
        • Installation of fire-fighting and industrial gates and curtains

        Installation of fire-fighting and industrial gates and curtains

        <h2> Installation of automatic fire doors</h2> <p> <b>Installation of automatic gates </b>is a rather difficult job that requires special knowledge, experience and skills from those performing it. All stages of installation must take place in strict sequence, in compliance with the norms and rules of such work. Otherwise, the finished structure will not be able to boast of the duration of operation, and the cost of its speedy repair will significantly exceed the cost of professional installation services.<br> </p> <ul> <li></li> <li>One of the most frequent orders is the installation of automatic sliding gates that move along the wall and do not take up much free space.</li> <li>The installation of swing gates is also popular, attracting users with its own mechanical stability and reliability of the opening mechanism.</li> <li>Among the owners of business facilities, the installation of roll gates is particularly in demand, which, when opened, compactly rise to the top of the opening and roll up into a roll located in a box.</li> <li>The simplest version of the design can be called a lifting gate. In spacious rooms and in limited areas, when opened, they rise to the ceiling, therefore they are extremely in demand as industrial gates.</li> </ul> <h3 style="text-align: left;"> Stages of gate installation </h3> <ol> <li>The process of installing gate structures varies somewhat, depending on their features. In general, it includes three stages:First, the opening is measured, the size of the gate structure depends on its dimensions, as well as its mechanism, due to which they will open and close.</li> <li>At the initial stage of installation, the company's masters are engaged in preparing the opening for the installation of the gate. Sometimes, for hanging a gate, an opening reinforcement with a welded structure is required. Next, specialists mount the guides required for the installation of sliding, roll-up or lifting gates. This job requires maximum care. After all, even a millimeter deviation in the future can provoke rapid wear of the lifting mechanism and other breakdowns.</li> <li>The fastening of the gate leaf is sometimes preceded by hanging sections together, based on the features of the chosen design.</li> </ol> Of course, gates of one type or another will be mounted with their own nuances.<br> <p> </p> <h3> The cost of installation of fire and industrial gates </h3> <p> The cost of installing fire barriers and gates is calculated individually and depends on many factors. Much depends on the correctness of the measurement (the measuring sheet is being prepared) and the preparation of the opening, all requirements are pre-specified in the TOR for the preparation of the opening. </p> <p> Even more, the installation price depends on the size of the gate, because the delivery and installation of large gates will require the use of special equipment. MVA industrial gates have a lot of weight and require special skills to install such products. </p> <h3> Why should the installation of gates be trusted by the specialists of the MBA company?</h3> <p> </p> <ul> <li></li> <li>We carry out installation not only with strict observance of norms and rules, but also following the needs of customers.</li> <li>We save time and money of customers, because the presence of average prices in the region and several teams of craftsmen allows you to install the gates at any time convenient for them, without weekends and holidays.</li> <li>We instruct users free of charge on further maintenance and operation of the gate.</li> <li>We conclude a contract and provide a long-term quality guarantee for installation work, as well as for gates, if they were purchased in our company.</li> </ul> <p> </p> <p> Remember, the uninterrupted operation of the gates and the absence of problems during their long-term operation directly depends on the quality of the installation work carried out. Therefore, do not take risks, contact the professionals of the MBA production company! </p> <h2>Installation of fire curtains MBA</h2> <p> Installation and adjustment of fire curtains should be carried out by specialists of the manufacturer, self-installation without a license of the Ministry of Emergency Situations threatens that damage to the canvas or the structure of the fire-resistant curtain is possible, as well as the fact that the inspecting fire inspection will not accept this design without the appropriate documents. </p> <p> Installers of our company, in addition to the direct installation of a fire curtain, connect the curtain control unit to the fire safety system and check the lowering of the barrier when a fire alarm is triggered. The fire-resistant barrier control unit has corresponding outputs - "normally closed dry contact". </p> <p> <img width="40%" alt="блок управления противопожарной и дымозащитной шторы" src="/upload/medialibrary/455/455c0a4f859bb25cd33c49296f3fc834.JPG" height="auto" title="блок управления противопожарной и дымозащитной шторы" class="responsive"><br> </p> <h3>Stages of installation of a fire curtain</h3> <p> </p> <ol> <li>Preparatory work and marking.</li> <li>Installation of the box.</li> <li>Installation of side rails.</li> <li>Mounting of the shaft with the web assembly.</li> <li>Installation of the web guide.</li> <li>Fixing of side covers of vertical guides.</li> <li>Installation of the control unit and adjustment of the end caps.</li> <li>Checking the operation of the fire curtain from the fire contact.</li> </ol> <br> <p> </p> <h3>Preparation of openings for installation</h3> As practice shows, many customers and construction contractors do not represent the process of installing fire-fighting structures and the weight of the canvas. Large-width multilayer curtains have a fairly decent weight due to the thick non-combustible fabric reinforced with metal thread. To install such fire barriers, a solid concrete or metal base is required. It is impossible to mount on GCL, silicate gas and other materials with insufficient strength.<br> To prevent problems with installation, our specialists prepare a technical specification for an object under construction, according to which preliminary preparation of the opening for installation is carried out, for example, the opening is reinforced with a construction of a metal square pipe. For the installation of fire curtains EI 60 at high altitude, lifting equipment and the presence of scaffolding-tour may be required. The need for such equipment and equipment is discussed with each customer individually.<br> <br> <img width="35%" alt="монтаж противопожарных штор" src="/upload/medialibrary/ceb/cebbe064988739e7d573d6f27ad14de9.jpg" height="auto" title="монтаж противопожарных штор"><br> <h3>Features of installation of smoke-proof and fire-fighting curtains of the "Accordion" type</h3> <p> The complex design of fire and smoke protection curtains "Accordion" requires high qualification and proper design of the structure before installation. The complex shape and large size of the curtains require the installation of several motors that lift each section. The synchronization of the motors lowering and lifting the box of the entire structure should be with minimal deviations, since there is a risk of distortion and jamming of the obstacle during movement. Due to the lack of guides, a special mechanism is provided that closes the edges of the accordion curtain with a metal box. The whole structure is lowered first, then the mechanism for closing the side rails is triggered, if such are provided for by the project. </p> <p> <img width="30%" alt="IMG_0254.jpg" src="/upload/medialibrary/06f/06f5797caa3d67730858198d95ce810d.jpg" height="auto" title="направляющая и ткань противопожарной шторы гармошка"><br> </p>

        2019-08-05

        mva-rolltor.ru

        Производственная компания МВА
        117405
        Россия
        Москва
        г. Москва, ул. Дорожная, д. 60, корп. 4, оф. 118
        +7 495 980-80-33
        https://mva-rolltor.ru/
        Installation of fire-fighting and industrial gates and curtains

        Installation of fire-fighting and industrial gates and curtains

        Installation of fire-fighting and industrial gates and curtains

        Installation of fire-fighting and industrial gates and curtains


        Share

        Back
        Company
        Certificates
        News
        Brands
        Contacts and representative offices
        Info
        Payment
        Delivery
        Legislative framework
        Site map
        Contacts
        +7 495 980-80-33
        info@mva-rolltor.ru
        Moscow, Dorozhnaya str., 60, building 4, office 118
        mva-rolltor.ru
        Противопожарные системы
        Social links
        • Вконтакте
        • Telegram
        • YouTube
        2023 © ООО «ППС». All rights reserved
        Privacy policy
        Print